1、Designation:F224205(Reapproved 2013)Standard Specification forProduction Acceptance Testing System for PoweredParachute Aircraft1This standard is issued under the fixed designation F2242;the number immediately following the designation indicates the year oforiginal adoption or,in the case of revisio
2、n,the year of last revision.A number in parentheses indicates the year of last reapproval.Asuperscript epsilon()indicates an editorial change since the last revision or reapproval.1.Scope1.1 The following requirements apply for the manufacturepowered parachute aircraft.This specification includes th
3、eproduction acceptance test requirements for powered parachuteaircraft.1.2 This specification applies to powered parachute aircraftseeking civil aviation authority approval,in the form of flightcertificates,flight permits,or other like documentation.1.3 This standard does not purport to address all
4、of thesafety concerns,if any,associated with its use.It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory requirements prior to use.2.Terminology2.1 Definitions:2.1.1 powered parachute,naircraft comp
5、rised of a flexibleor semi-rigid wing connected to a fuselage in such a way thatthe wing is not in position for flight until the aircraft is inmotion.This aircraft has a fuselage with seats,engine,andwheels(or floats),such that the wing and engine cannot beflown without the wheels(or floats)and seat
6、(s).Unique to thepowered parachute is the large displacement between thecenter of lift(high)and the center of gravity(low),which ispendulum effect.Pendulum effect limits angle of attachchanges,provides stall resistance and maintains flight stability.3.Significance and Use3.1 The purpose of this spec
7、ification is to provide theminimum requirements for the establishment of a ground andflight test program for verifying the initial(first run)productionaircraft meets certain operational performance requirementsthat have been set forth by the manufacturer in its AircraftOperating Instructions.3.2 In
8、addition,this specification provides minimum re-quirements to verify that each subsequent production airplanehas no obvious defects that would prevent the safe operation ofthe airplane.4.Production Acceptance Testing,Ground Testing4.1 Inspection VerificationThere shall be a written proce-dure in eff
9、ect to verify all top-level inspections have beencompleted and no discrepancies remain open.4.2 Engine Break-InThere shall be a written procedure ineffect to perform the engine break-in.This procedure mayinclude all engine gage verification of operation.All enginereadings shall achieve the normal ac
10、cepted range of readingscommensurate with a new engine.If not performed duringengine break-in,then this verification must be performed underseparate procedures.All engine gages shall be verified to beoperating.5.Production Acceptance Testing,Flight Testing5.1 Every production aircraft shall be fligh
11、t tested to thefollowing minimums:5.1.1 Powered ParachutesFifteen minutes flight time,including at least one takeoff and landing,trimming of flightcontrols,and verification of control for left turn,right turn,andflare(flare only if so equipped).5.2 Instrument VerificationThere shall be a written pro
12、ce-dure in effect to verify that all other instruments are operatingwithin normal ranges.If equipped with a compass,the compassvariation card data shall be developed with the engine running.6.Post Flight Acceptance6.1 There shall be a written procedure in effect to performpost flight inspection that
13、 will review all flight critical attach-ments and structures.6.2 The reviewing personnel shall sign all post flight reviewdocuments.7.Documentation:7.1 There shall be a written procedure in effect to properlydocument and store the production acceptance test results suchthat they are correlated to th
14、e specific aircraft for futurereference.1This specification is under the jurisdiction of ASTM Committee F37 on LightSport Aircraft and is the direct responsibility of Subcommittee F37.30 on PowerParachute.Current edition approved June 1,2013.Published August 2013.Originallyapproved in 2003.Last prev
15、ious edition approved in 2008 as F2242 05(2008).DOI:10.1520/F2242-05R13.Copyright ASTM International,100 Barr Harbor Drive,PO Box C700,West Conshohocken,PA 19428-2959.United States1 7.2 Test Failures:7.2.1 There shall be a written procedure in effect to reviewthe causes for any aircraft failures in
16、the production acceptancetests phases.Aircraft may only be released for retest aftermanufacturing review of the discrepant articles and writtenrelease for retest.8.Keywords8.1 light sport aircraft;powered parachute aircraft;specialairworthiness certificateASTM International takes no position respecting the validity of any patent rights asserted in connection with any item mentionedin this standard.Users of this standard are expressly advised that determination of the validity of any such patent