收藏 分享(赏)

_RP_5L8-1996_2015.pdf

上传人:益****师 文档编号:166548 上传时间:2023-03-03 格式:PDF 页数:52 大小:2.47MB
下载 相关 举报
_RP_5L8-1996_2015.pdf_第1页
第1页 / 共52页
_RP_5L8-1996_2015.pdf_第2页
第2页 / 共52页
_RP_5L8-1996_2015.pdf_第3页
第3页 / 共52页
_RP_5L8-1996_2015.pdf_第4页
第4页 / 共52页
_RP_5L8-1996_2015.pdf_第5页
第5页 / 共52页
_RP_5L8-1996_2015.pdf_第6页
第6页 / 共52页
亲,该文档总共52页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、Recommended Practice for Field Inspection of New Line PipeAPI RECOMMENDED PRACTICE 5L8SECOND EDITION,DECEMBER 1996REAFFIRMED,MAY 2015energliill AMERICAN PETROLEUM INSTITUTE Recommended Practice for Field Inspection of New Line PipeUpstream SegmentAPI RECOMMENDED PRACTICE 5L8SECOND EDITION,DECEMBER 1

2、996REAFFIRMED,MAY 2015energitill AMERICAN PETROLEUM INSTITUTE FOREWORD This recommended practice is under the jurisdiction of the API Subcommittee on Standardization of Tubular Goods.Included in this practice are the recommended procedures for field inspection and testing of new plain-end line pipe.

3、This recommended practice has been prepared specifically to address the practices and technology used in field inspection of line pipe,and certain parts are not suitable or appropriate for mill inspections.The recommended practices established within this document are intended as an inspection and/o

4、r testing guide,and nothing in this guide shall be interpreted to prohibit the agency or owner from using personal judgment,supplementing the inspection with other techniques,extending existing techniques,or reinspecting certain lengths.This recommended practice covers the qualification of inspectio

5、n personnel,a description of inspection methods,apparatus calibration,and standardization procedures for various inspection methods.The evaluation of imperfections and marking of inspected new line pipe are included.This document shall be used as a guide applicable to the methods for field inspectio

6、n and shall not be used as a basis for acceptance or rejection.Acceptance or rejection of new API monogrammed line pipe shall be based on conformance with API Specification SL.This practice shall become effective on the date printed on the cover but may be used voluntarily from the date of distribut

7、ion.API publications may be used by anyone desiring to do so.Every effort has been made by the Institute to assure the accuracy and reliability of the data contained in them;however,the Institute makes no representation,warranty,or guarantee in connection with this publication and hereby expressly d

8、isclaims any liability or responsibility for loss or damage resulting from its use or for the violation of any federal,state,or municipal regulation with which this publication may conflict.Suggested revisions are invited and should be submitted to the director of the Exploration and Production Depa

9、rtment,American Petroleum Institute,1220 L Street,N.W.,Washington,D.C.20005.iii CONTENTS Page SCOPE AND APPLICATION.I I.I Basis for Inspection.1.2 Applicability of Inspections.l 1.3 Repeatability of Results.I 1.4 Consequences of Variability.2 2 REFERENCES.2 3 DEFINITION OF TERMS.2 4 QUALITY ASSURANC

10、E.9 5 QUALIFICATION OF INSPECTION PERSONNEL.9 5.1 Scope.9 5.2 Written Procedure.9 5.3 Qualification of Inspection Personnel.9 5.4 Training Programs.9 5.5 Examinations.I 0 5.6 Experience.10 5.7 Requalification.10 5.8 Documentation.10 5.9 NDT Personnel Certification.10 6 GENERAL INSPECTION PROCEDURES.

11、10 6.1 Scope.I 0 6.2 Pre-inspection Procedures.10 6.3 Records and Notification.11 6.4 Post-inspection Procedures.11 7 ACCEPTANCE CRITERIA,DISPOSITION,AND RESPONSIBILITY.11 7.1 Scope.11 7.2 Basis for Acceptance.11 7.3 Responsibility for Rejections.11 8 VISUAL AND DIMENSIONAL INSPECTION.12 8.1 Scope.1

12、2 8.2 Application.12 8.3 Equipment(including calibration).12 8.4 External Surface Illumination.12 8.5 Internal Surface Illumination.12 8.6 Full-Length Visual Inspection of Line Pipe(FLVI).13 8.7 Diameter and Bevel Check on Pipe Ends.13 9 HARDNESS TESTING.14 9.1 Scope.14 9.2 Application.14 9.3 Equipm

13、ent.14 9.4 Calibration and Standardization.14 9.5 Procedures.15 V Page IO MAGNETIC PARTICLE INSPECTION(MPI).15 10.1 Scope.15 10.2 Application.15 10.3 Equipment,Materials,and General Procedures.15 10.4 Calibration and Standardization.17 10.5 Procedures for Inspection of Longitudinal Welds,Inside and

14、Outside Surface(FLMPIW,FLMPOW).18 10.6 Full Body Inspection,Inside and Outside Surface.18 10.7 End Area Inspection(EAI).19 11 ELECTROMAGNETIC INSPECTION.19 11.1 Scope.19 11.2 Application.19 11.3 Equipment.19 11.4 Calibration and Standardization.19 11.5 Inspection Procedures.21 12 RESIDUAL MAGNETISM

15、AND DEMAGNETIZATION.22 12.1 Scope.22 12.2 Application.22 12.3 Demagnetization Services.22 13 GAMMA RAY WALL THICKNESS MEASUREMENT.22 13.1 Scope.22 13.2 Application.23 13.3 Equipment.23 13.4 Calibration and Standardization.23 13.5 Inspection Procedure.23 14 ELECTROMAGNETIC GRADE COMPARISON.23 14.1 Sc

16、ope.23 14.2 Application.23 14.3 Equipment.23 14.4 Calibration and Standardization.23 14.5 Inspection Procedure.24 15 ULTRASONIC INSPECTION.24 15.1 Scope.24 15.2 Application.24 15.3 General Procedures for Calibration,Standardization,and Inspection.24 15.4 Ultrasonic Inspection of Pipe Welds(UTW).25 15.5 Inspection of the Pipe Body for Wall Thinning and Planar Imperfections(UTBL).26 15.6 Inspection of the Pipe Body for Longitudinal,Transverse,and Oblique Imperfections(UTBLTO).27 15.7 Inspection of

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 专业资料 > 国外标准

copyright@ 2008-2023 wnwk.com网站版权所有

经营许可证编号:浙ICP备2024059924号-2