1、山东时风起发建筑安装工程有限公司主要起草人员:黄楠张伟薛立峰杜海滨徐艳华陈立全贾燕孙冰冯功斌肖龙刘涛刁文鹏刘刚杨丽陈旭祁忠华高力心韩冬曹玉虎王茂辉张宝龙黄超徐辉朝朱骞王晓东朱先方李付强孙维祥闫高燕贾秋奇郭起发朱春飞洪寿涛张艳国韩宇杨宝成郭志远主要审查人员:梁洋张英明耿洁明石剑万立华万睦杨杰王洪林彭强Contents1 General provisions.2 Terms.23 Basic requirements.44 Design calculation.64.1 General requirements.64.2 Construction calculation.115 Construct
2、ion requirements145.1 General requirements145.2 Structure of the scaffold.155.3 Attached supporting device.175.4 Safety device.185.5 Lift mechanism.196 Installation,lifting,usage and dismantlement.216.1 General requirements2116.2 Installation.2116.3 Lifting.226.4 Usage.236.5 Dismantlement.237 Check
3、and acceptance.257.1 General requirements25257.2 Site check.25257.3 Installation check and acceptance.25257.4 Check and acceptance before lifting and after lifting.26267.5 Regular check.26267.6 Inspection.26268 Safety management.28288.1 General requirements28288.2 Maintenance and scrapping.30Appendix A Self-checklists of attached lifting scaffold.3131Appendix B Checklists of attached lifting scaffold before usage 3636Appendix C Inspection report of attached lifting scaffold.40