收藏 分享(赏)

IEC_61850_-_Design_and_Implementation_of_PLC_Systems.pdf

上传人:益****师 文档编号:232597 上传时间:2023-03-14 格式:PDF 页数:84 大小:2.35MB
下载 相关 举报
IEC_61850_-_Design_and_Implementation_of_PLC_Systems.pdf_第1页
第1页 / 共84页
IEC_61850_-_Design_and_Implementation_of_PLC_Systems.pdf_第2页
第2页 / 共84页
IEC_61850_-_Design_and_Implementation_of_PLC_Systems.pdf_第3页
第3页 / 共84页
IEC_61850_-_Design_and_Implementation_of_PLC_Systems.pdf_第4页
第4页 / 共84页
IEC_61850_-_Design_and_Implementation_of_PLC_Systems.pdf_第5页
第5页 / 共84页
IEC_61850_-_Design_and_Implementation_of_PLC_Systems.pdf_第6页
第6页 / 共84页
亲,该文档总共84页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、Design and Implementationof an IEC 61850 gateway forPLC SystemsJonas LidnMaster ThesisStockholm,Sweden 2006XR-EE-ICS 2006:021Abstract This master thesis presents the result of an investigation and testing of IEC 61850 introduction into Vattenfall Vattenkraft ABs technical systems for turbine control

2、lers.The work started with an investigation of todays automation products with focus on station bus communication.Today Vattenfall Vattenkraft AB are modernising their automation products in many of their hydro power plants,and the turbine controllers are developed by SwedPower AB on standard PLCs f

3、rom Siemens Automation and Drives.Therefore the product focus has been PLC systems from Siemens for compatibility with the modern turbine controller used today.The initial investigation provided a few alternatives for how to implement and test an IEC 61850 interface for turbine controllers,one of th

4、ese alternatives were selected for implementation and tested regarding communication on the station bus and for a few data values.The report describes the implementation and the results of the testing.Today there are no PLCs capable of communicating in accordance to IEC 61850,the interface implement

5、ed and tested during this master thesis work provides an interface based on an industrial PC gateway for PLCs to communicate using the IEC 61850 standard.Keywords IEC 61850,PLC,Simatic S7,AX-S4 MMS,Gateway.Preface This technical report is the result of my master thesis work that has been conducted o

6、n Vattenfall Utveckling AB.The supervisors for this work are Mr.Anders Johnsson from Vattenfall Utveckling AB and Mr.Lars Nordstrm from the department of Industrial Information and Control Systems at the Royal Institute of Technology.Mr Per-Anders Nordlander from Vattenfall Vattenkraft AB and Mr Hen

7、rik Wiechel from SwedPower AB have given many valuable opinions and implementation help regarding the functions and testing of the IEC 61850 interface.This report is in first hand written for people with knowledge of the electric power industry already familiar with the many terms used in substation

8、s and hydro power plants.Readers not introduced to the standard of IEC 61850 are recommended to read Appendix 1-IEC 61850 after the initial chapter of IEC 61850 found in chapter 3.1.I hope that all readers find it valuable and interesting.Stockholm,06-03-28 Jonas Lidn jonlindekth.se 4 Abstract.2 Pre

9、face.3 1 Introduction.7 1.1 Purpose.7 1.2 Background.7 1.3 Outline of the report.8 2 Research Method.10 2.1 Goals.10 2.2 Scope of the study.10 2.3 Problem description.10 2.4 Research Problem.11 2.5 Implementation guidelines.11 2.6 Investigation path.12 2.7 Literature.12 3 Communication solutions.14

10、3.1 IEC 61850 Overview.14 3.2 OPC.17 3.3 MMS.18 4 Product information.20 4.1 Siemens S7 PLC.20 4.2 ABB AC 800M PLC.23 4.3 Siemens Simatic Microbox 420.24 4.4 Tamarack software stack for embedded systems.25 4.5 MMS-EASE Lite.25 4.6 AX-S4 MMS.26 4.7 SOFTNET for PROFIBUS.27 5 Design alternatives.28 5.1

11、 Implementation on ABB PLC system:.29 5.2 Implementation on Siemens PLC system:.30 5.3 PC Gateway design.30 5.4 Rejected alternatives.31 6 Design proposal.33 6.1 Overview.33 6.2 Hardware:.33 6.3 Software.34 6.4 Design specifications.34 7 Testing the interface.37 8 Results.40 9 Future work.41 9.1 Imp

12、lemented interface.41 9.2 Future products.42 10 References to external experts.44 11 References for articles and manuals.45 Appendix 1-IEC 61850.1 The ACSI-model.4 Data modelling.7 Communication services.17 Client/Server communication.21 Reporting.25 Logging.28 5 Control class model.30 Comparison of

13、 the data access methods.30 Communication mappings.31 Appendix 2-Definitions.1 Logical Nodes.1 Data Objects.2 6 Glossary ACSI:Abstract Communication Service Interface GOOSE:Generic Object Oriented Substation Event GSE:Generic Substation Event GSSE:Generic Substation State Event PICOM:Piece of Inform

14、ation for COMmunication SCSM:Specific Communication Service Mapping SV:Sampled Values OSI:Open Systems Interconnection LN:Logical Node LD:Logical Device CDC:Common Data Class SCL:Substation Configuration Language XML:Extensible Mark-up Language SCADA:Supervisory Control and Data Acquisition HMI:Huma

15、n Machine Interface IED:Intelligent Electronic Device PAS:Power Station System TPAA:Two Party Application Association MCAA:Multicast Application Association RCB:Report Control Block URCB:Un-buffered Report Control Block BRCB:Buffered Report Control Block SGCB:Setting Group Control Block PLC:Programm

16、able Logic Controller MMS:Manufacturer Message Specification OPC:OLE for Process Control Analogue I/O:Analogue signal for Input or Output,usually 4-20mA.4mA means minimum and 20mA means maximum signal strength.Digital I/O:Digital signal for Input or Output,0 or 1 for on or off.7 1 Introduction 1.1 Purpose Vattenfall AB Vattenkrafts purpose with the initiation of this master thesis is to investigate the prerequisites and consequences of an IEC 61850 introduction in their automation systems.In lin