收藏 分享(赏)

IEC_62271-112_Ed_1.0.pdf

上传人:益****师 文档编号:234091 上传时间:2023-03-14 格式:PDF 页数:24 大小:753.41KB
下载 相关 举报
IEC_62271-112_Ed_1.0.pdf_第1页
第1页 / 共24页
IEC_62271-112_Ed_1.0.pdf_第2页
第2页 / 共24页
IEC_62271-112_Ed_1.0.pdf_第3页
第3页 / 共24页
IEC_62271-112_Ed_1.0.pdf_第4页
第4页 / 共24页
IEC_62271-112_Ed_1.0.pdf_第5页
第5页 / 共24页
IEC_62271-112_Ed_1.0.pdf_第6页
第6页 / 共24页
亲,该文档总共24页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、 Registered trademark of the International Electrotechnical Commission 17A/998/CDV COMMITTEE DRAFT FOR VOTE(CDV)PROJET DE COMIT POUR VOTE(CDV)Project number IEC 62271-112 Ed 1.0 Numro de projet IEC/TC or SC:SC 17A CEI/CE ou SC:Secretariat/Secrtariat Sweden Submitted for parallel voting in CENELEC So

2、umis au vote parallle au CENELEC Date of circulation Date de diffusion 2012-03-23 Closing date for voting(Voting mandatory for P-members)Date de clture du vote(Vote obligatoire pour les membres(P)2012-09-07 Also of interest to the following committees Intresse galement les comits suivants Supersedes

3、 document Remplace le document 17A/969/CD,17A/985/CC and item 7.2 of 17A/992/RM Proposed horizontal standard Norme horizontale suggre Other TC/SCs are requested to indicate their interest,if any,in this CDV to the TC/SC secretary Les autres CE/SC sont requis dindiquer leur intrt,si ncessaire,dans ce

4、 CDV lintention du secrtaire du CE/SC Functions concerned Fonctions concernes Safety Scurit EMC CEM Environment Environnement Quality assurance Assurance qualit CE DOCUMENT EST TOUJOURS LTUDE ET SUSCEPTIBLE DE MODIFICATION.IL NE PEUT SERVIR DE RFRENCE.LES RCIPIENDAIRES DU PRSENT DOCUMENT SONT INVITS

5、 PRSENTER,AVEC LEURS OBSERVATIONS,LA NOTIFICATION DES DROITS DE PROPRIT DONT ILS AURAIENT VENTUELLEMENT CONNAISSANCE ET FOURNIR UNE DOCUMENTATION EXPLICATIVE.THIS DOCUMENT IS STILL UNDER STUDY AND SUBJECT TO CHANGE.IT SHOULD NOT BE USED FOR REFERENCE PURPOSES.RECIPIENTS OF THIS DOCUMENT ARE INVITED

6、TO SUBMIT,WITH THEIR COMMENTS,NOTIFICATION OF ANY RELEVANT PATENT RIGHTS OF WHICH THEY ARE AWARE AND TO PROVIDE SUPPORTING DOCUMENTATION.Titre :CEI 62271-112 Ed 1.0:Appareillage haute tension-Partie 112:Sectionneurs de terre rapides courant alternatif pour lextinction de larc secondaire sur les lign

7、es de transport Title:IEC 62271-112 Ed 1.0:High-voltage switchgear and controlgear-Part 112:Alternating current high-speed earthing switches for secondary arc extinction on transmission lines Note dintroduction Introductory note ATTENTION VOTE PARALLLE CEI CENELEC Lattention des Comits nationaux de

8、la CEI,membres du CENELEC,est attire sur le fait que ce projet de comit pour vote(CDV)de Norme internationale est soumis au vote parallle.Les membres du CENELEC sont invits voter via le systme de vote en ligne du CENELEC.ATTENTION IEC CENELEC PARALLEL VOTING The attention of IEC National Committees,

9、members of CENELEC,is drawn to the fact that this Committee Draft for Vote(CDV)for an International Standard is submitted for parallel voting.The CENELEC members are invited to vote through the CENELEC online voting system.Copyright 2012 International Electrotechnical Commission,IEC.All rights reser

10、ved.It is permitted to download this electronic file,to make a copy and to print out the content for the sole purpose of preparing National Committee positions.You may not copy or mirror the file or printed version of the document,or any part of it,for any other purpose without permission in writing

11、 from IEC.CONTENTS FOREWORD.3 1 General.6 1.1 Scope.6 1.2 Normative references.6 2 Normal and special service conditions.6 3 Terms and definitions.6 3.1 General terms.6 3.2 Assemblies of switchgear and controlgear.8 3.3 Parts of assemblies.8 3.4 Switching devices.8 3.5 Parts of switchgear and contro

12、lgear.8 3.6 Operation.8 3.7 Characteristics quantities.8 4 Ratings.9 5 Design and construction.10 6 Type tests.11 6.1.1 Grouping of tests.12 6.5 Temperature-rise tests.12 7 Routine tests.13 8 Guide to the selection of HSES.14 9 Information to be given with enquiries,tenders and orders.14 10 Rules fo

13、r transport,storage,installation,operation and maintenance.14 11 Safety.14 Annex A(informative)Background information on the use of HSES.15 Annex B(informative)Induced current and voltage conditions for other cases.20 Figure 1 Explanation of a multi-phase auto-reclosing scheme.7 Figure 2-Timing char

14、t of HSES and CB.10 Figure A.1 Single-line diagram of a power system.15 Figure A.2 Timing chart of the HSESs in relation to the transmission line circuit-breakers.16 Figure A.3 Typical timing chart showing the time between fault initiation and a successful re-close of the transmission line circuit-b

15、reakers.17 Figure B.1-System condition to explain successive fault.20 Figure B.2 Example of waveforms of delayed current zero phenomena.21 Figure B.3 Typical test circuit for electromagnetic duty of a HSES with delayed current zero crossings.22 Figure B.4 typical test circuit for electrostatic duty

16、of HSES with delayed current zero crossings.23 Table 1-Standardized values of rated induced currents and voltages.10 Table A.1-Comparison of earthing switches.19 62271-112 IEC:2012 2 Table B.1-Preferred values for single-phase earth faults with delayed current zero phenomena in the presence of a successive fault.22 Table B.2 Preferred values for multi-phase earth faults in a double-circuit system.23 17A/998/CDV62271-112 IEC:2012 3 INTERNATIONAL ELECTROTECHNICAL COMMISSION _ HIGH-VOLTAGE SWITCHGE

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 专业资料 > 国外标准

copyright@ 2008-2023 wnwk.com网站版权所有

经营许可证编号:浙ICP备2024059924号-2