1、FOR200 AlsInt22HorNorFunFon CE CITTELOUTFINSDE VDOIVNORNATLESLEUAURDOC TitrCESphPa TitleIESaPa RM FDIS(IEC)/FO07-08-01 Submitted foSoumis au voo of interest to tresse galeme,64 rizontal standarrme horizontale Other TC/SCLes autres Cnctions concernnctions concern Safety Scurit DOCUMENT EST U COMME NO
2、RMELE.TRE LE FAIT DTRS INDUSTRIELLES,VUE DES UTILISATVENT PARFOIS TRRMES POUVANT TIONALES.RCIPIENDAIRES RS OBSERVATIONRAIENT VENTUCUMENTATION EXPre EI 62109-2curit deshotovoltaartie 2:Exe C 62109-2afety of poart 2:PartiLattentioCENELECinLes membrCopyrighpermitted purpose oprinted vewriting froORMULA
3、IRE FDISr parallel votingote parallle au the following coent les comits srd e Cs are requestedE/SC sont requed es UN PROJET DIFFUSE INTERNATIONALE EXAMINS POURTECHNOLOGIQUETEURS,LES PROJERE EXAMINS EN VSERVIR DE RFDU PRSENT DOCNS,LA NOTIFICATIELLEMENT CONPLICATIVE.2 Ed.1:s convertques xigences p2 Ed
4、.1:ower convicular reqAVOTECEIon des Comits,est attire sur nternationale esres du CENELEde vote ent 2011 Ito downloaof preparingersion of thom IEC.S(CEI)in CENELEC CENELEC ommittees suivants d to indicate theis dindiquer leu EM CES POUR APPROBE AVANT SA PUBR TABLIR SILS SOES ET COMMERCIAETS FINAUX D
5、E NOVUE DE LEUR POSFRENCE DANS CUMENT SONT INVION DES DROITS DNNAISSANCE ETisseurs departiculireverters foruirementsATTENTION E PARALLLEI CENELEC nationaux de lale fait que ce pst soumis au votEC sont invits ligne du CENEnternationaad this electg National e documenProjeNumIEC/82Distr201eir interest,
6、if anyur intrt,si ncMC EM BATION.IL NE PEUBLICATION EN TANONT ACCEPTABLESLES,AINSI QUE DUORMES INTERNATIOSIBILIT DE DEVENLES RGLEMENTITS PRSENTERDE PROPRIT DOT FOURNIRe puissanes pour ler use in phs for inver a CEI,membresrojet finale de Nte parallle.voter via le sysELEC.al Electrottronic file,toCom
7、mitteent,or any pect number mro de projet/TC or SC CEI/ributed on/Diffu1-02-18 SuperRemp82/5y,in this FDIS tcessaire,dans cUT TRE NT QUE S DES U POINT ONALES NIR DES TATIONS R,AVEC ONT ILS R UNE THIS DREFER IN ADDTECHNINTERNTHE LIGMAY BE RECIPICOMMEARE AWce utilisses onduleuhotovoltaicrters s du Nor
8、me stme ThCENEThechnical Co make a c positions.part of it,foFINAL DPROJET FIEC 6210CE ou SC us le rsedes documeplace le docume79/CDV&82o the TC/SC sece FDIS lintenEnvironmentEnvironnemeDOCUMENT IS A RRED TO AS AN INTDITION TO THEIRNOLOGICAL,COMNATIONAL STANDAGHT OF THEIR POTE MADE IN NATIONIENTS OF
9、THIS ENTS,NOTIFICATIOWARE AND TO PROs dans lesurs c power she attention of IELEC,is drawn Standard(DIhe CENELEC mCENECommissionopy and to You may or any otheDRAFT INTEINAL DE NO09-2 Ed.1 SecretaUSA Voting te2011-0nt ent 2/601/RVC ecretary ntion du secrtat ent DRAFT DISTRIBUTTERNATIONAL STANEVALUATIO
10、N AS BMMERCIAL AND ARDS MAY ON OCTENTIAL TO BECOMNAL REGULATIONS.DOCUMENT AREON OF ANY RELEVOVIDE SUPPORTINGs systmessystems ATTENTIOIEC CENELPARALLEL VOEC National Coto the fact that IS)is submittedmembers are invELEC online votn,IEC.All print out thnot copy or purpose w82/63RNATIONALORME INTERriat
11、/Secrtariaerminates on/V04-22 aire du CE/SC Quality asAssurancTED FOR APPROVNDARD UNTIL PUBLBEING ACCEPTABUSER PURPOSCCASION HAVE TOME STANDARDS TO INVITED TO SUVANT PATENT RIGG DOCUMENTATIOs de prodON LEC OTING ommittees,memthis final draft In for parallel votivited to vote throting system.rights r
12、esee content foor mirror without per36/FDISL STANDARRNATIONALat Vote clos le ssurance ce de la qualitVAL.IT MAY NOTLISHED AS SUCH.LE FOR INDUSTRISES,FINAL DRAO BE CONSIDEREDO WHICH REFERENUBMIT,WITH THHTS OF WHICH THN.uction mbers of nternational ing.ough the erved.It is or the sole the file or rmis
13、sion in S RDLEBE IAL,AFT D IN NCE EIR HEY 2 62109-2/FDIS IEC CONTENTS FOREWORD.4 INTRODUCTION.6 1 Scope and object.7 1.1 Scope.7 2 Normative references.7 3 Terms and definitions.8 4 General testing requirements.9 4.4 Testing in single fault condition.9 4.4.4 Single fault conditions to be applied.9 4
14、.4.4.15 Fault-tolerance of protection for grid-interactive inverters.9 4.4.4.16 Stand-alone inverters Load transfer test.12 4.4.4.17 Cooling system failure Blanketing test.12 4.7 Electrical ratings tests.12 4.7.3 Measurement requirements for AC output ports for stand-alone inverters.13 4.7.4 Stand-a
15、lone Inverter AC output voltage and frequency.13 4.7.4.1 General.13 4.7.4.2 Steady state output voltage at nominal DC input.13 4.7.4.3 Steady state output voltage across the DC input range.13 4.7.4.4 Load step response of the output voltage at nominal DC input.13 4.7.4.5 Steady state output frequenc
16、y.13 4.7.5 Stand-alone inverter output voltage waveform.14 4.7.5.1 General.14 4.7.5.2 Sinusoidal output voltage waveform requirements.14 4.7.5.3 Non-sinusoidal output waveform requirements.14 4.7.5.4 Information requirements for non-sinusoidal waveforms.14 4.7.5.5 Output voltage waveform requirements for inverters for dedicated loads.15 4.8 Additional tests for grid-interactive inverters.15 4.8.1 General requirements regarding inverter isolation and array grounding.15 4.8.2 Array insulation resi