收藏 分享(赏)

BS_9295-2020.pdf

上传人:益****师 文档编号:468802 上传时间:2023-04-01 格式:PDF 页数:145 大小:72.22MB
下载 相关 举报
BS_9295-2020.pdf_第1页
第1页 / 共145页
BS_9295-2020.pdf_第2页
第2页 / 共145页
BS_9295-2020.pdf_第3页
第3页 / 共145页
BS_9295-2020.pdf_第4页
第4页 / 共145页
BS_9295-2020.pdf_第5页
第5页 / 共145页
BS_9295-2020.pdf_第6页
第6页 / 共145页
亲,该文档总共145页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、BS9295:2020BSI Standards PublicationGuide to the structural design ofburied pipesbsi.BRITISH STANDARDBS9295:20208.1General70Figure 28-Flowchart for design of semi-rigid pipes of ductile iron8.2Installation conditions70Table 24-Semi-rigid pipe embedments71Table 25-Semi-rigid and flexible pipe embedme

2、nt properties728.3Design pressures for semi-rigid pipes72Table 26-Load coefficients for incomplete projection condition73Figure 29-Deflection lag factor74Table 27-Guide values of Spangler modulus for native soils,E758.4 Semi-rigid pipe embedment properties758.5 Design data for semi-rigid pipes768.6B

3、edding for ductile iron pipes76Table 28-Embedment classes778.7Simplified bedding table for ductile iron pipes77Table 29-Safe depths of cover(m)for ductile iron water pipe with field surcharge79Table 30-Safe depths of cover(m)for ductile iron water pipe with main road surcharge81Table 31-Safe depths

4、of cover(m)for ductile iron sewer pipe with field surcharge83Table 32-Safe depths of cover(m)for ductile iron sewer pipe with main road surcharge85Annex A(informative)Other design considerations87Figure A.1-Soil loads and stresses produced by surface loads(after Fadum 13)88Figure A.2-Uniform surchar

5、ge U/unit area of limited extent in fixed position89Figure A.3-Pipe in tunnel,heading or jacked into place90Figure A.4-Multiple pipe trenches92Figure A.5-Uneven loading of multiple pipes laid in parallel93Figure A.6-Circumstances which can result in large lateral loads:Embankment94Figure A.7-Schemat

6、ic of groundwater flotation forces96Figure A.8-Pipelines in poor ground98Figure A.9-Use of geotextile around pipe embedment99Figure A.10-Pipeline on piles100Table A.1-Recommended maximum length of rocker pipes101Figure A.11-Protection of a shallow pipeline using concrete surround104Figure A.12-Prote

7、ction of shallow pipeline with a slab105Figure A.13-Plain and reinforced beddings and surrounds107Figure A.14-Pipework under a floor slab108Figure A.15-Pipework built in to the wall109Figure A.16-Pipework passing through the wall109Table A.2-Overview of limit state conditions to be checked for longi

8、tudinal effects111Table A.3-Compaction fractions for bedding materials115Table A.4-Gradings116Table A.5-Maximum recommended level of impurity(by mass)116Table A.6-Equation errors(percent)118Bibliography135Summary of pagesThis document comprises a front cover,and inside front cover,pages i to vi,pages 1 to 137,an inside back coverand a back cover.THE BRITISH STANDARDS INSTITUTION 2020-ALL RIGHTS RESERVED III

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 专业资料 > 国外标准

copyright@ 2008-2023 wnwk.com网站版权所有

经营许可证编号:浙ICP备2024059924号-2