1、本方案称号为荣资商城2号楼,位于包头市钢铁年夜巷北,构造范例主体2,一层层高5.4m,二层层高4.5m,三六层层高为3.3m,一二层为商场,三六层为办公楼.室表里高差450mm,修建物总高度24m。按照屋宇布防烈度、构造范例跟屋宇高度,该六层框架构造断定为抗震烈度为八度,抗震品级为二级,方案运用年限50年,修建防火品级为二级,修建耐火品级为二级,持久年限为二级,平安品级为二级,构造的主要性系数取1.0。在进展框架构造方案时,进展层间荷载代表值的盘算,用极点位移法求出自震周期,按底部剪力法盘算程度地动荷载感化下的内力,用弯矩调配法盘算竖向荷载感化下的构造内力,并通过内力组合寻出最倒霉内力组合,进
2、展框架柱、框架梁的截面、配筋方案。还计罢了次梁、楼梯的荷载,进一步进展了截面、配筋的盘算,并进展了柱下独破根底的盘算.要害词工程概略盘算前提框架构造AbstractThenameofthedesignofthesecondbuildingofaRongzimall,BaotouIronandSteellocatedintheNorthMainStreet,Structuretypeselectionbasedonsixmainframe,atotalconstructionareaof5042.52,ahigh-level5.4 m,Twolayersof4.5 mhigh,threesixl
3、ayersof3.3 mhigh,oneandtwolayersshoppingcenter,Three-sixlayersofficebuilding,Indoorandoutdoor450 mmheightdifference,Buildingheight24 m.AccordingtotheHousingdefensiveintensity,structuretypeandheightofhousing,Thesix-storeyframestructureasseismicintensitytoeightdegrees,.Framestructureduringthedesign,la
4、yerrepresentativevalueoftheload,withpeakdemandfromthedisplacementmethodearthquakecycle,atthebottomofshearhorizontalseismicloadcalculationunderstress,Momentdistributioncalculatedverticalloadstructureundertheinternalforces,andthroughinternalforcestofindthebestcombinationofadverseinternalforcecomposition,forcolumns,beamsframeworkofthesection,thedesignofreinforcement.Alsocalculatedthesecondbeam,staircasesoftheload,afurthersection,thereinforcement,andcalculatethecolumnunderanindependentbasisofcalculationKeywordsProjectOverviewCalculationconditionsFrameStructure,