收藏 分享(赏)

_RP_2611-2011.pdf

上传人:益****师 文档编号:166509 上传时间:2023-03-03 格式:PDF 页数:54 大小:764.80KB
下载 相关 举报
_RP_2611-2011.pdf_第1页
第1页 / 共54页
_RP_2611-2011.pdf_第2页
第2页 / 共54页
_RP_2611-2011.pdf_第3页
第3页 / 共54页
_RP_2611-2011.pdf_第4页
第4页 / 共54页
_RP_2611-2011.pdf_第5页
第5页 / 共54页
_RP_2611-2011.pdf_第6页
第6页 / 共54页
亲,该文档总共54页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、Terminal Piping InspectionInspection of In-Service Terminal Piping SystemsAPI RECOMMENDED PRACTICE 2611 FIRST EDITION,JUNE 2011 Terminal Piping Inspection Inspection of In-Service Terminal Piping SystemsDownstream SegmentAPI RECOMMENDED PRACTICE 2611 FIRST EDITION,JUNE 2011 Special NotesAPI publicat

2、ions necessarily address problems of a general nature.With respect to particular circumstances,local,state,and federal laws and regulations should be reviewed.Neither API nor any of APIs employees,subcontractors,consultants,committees,or other assignees make any warranty or representation,either exp

3、ress or implied,with respect to the accuracy,completeness,or usefulness of the information contained herein,or assume any liability or responsibility for any use,or the results of such use,of any information or process disclosed in this publication.Neither API nor any of APIs employees,subcontractor

4、s,consultants,or other assignees represent that use of this publication would not infringe upon privately owned rights.API publications may be used by anyone desiring to do so.Every effort has been made by the Institute to assure the accuracy and reliability of the data contained in them;however,the

5、 Institute makes no representation,warranty,or guarantee in connection with this publication and hereby expressly disclaims any liability or responsibility for loss or damage resulting from its use or for the violation of any authorities having jurisdiction with which this publication may conflict.A

6、PI publications are published to facilitate the broad availability of proven,sound engineering and operating practices.These publications are not intended to obviate the need for applying sound engineering judgment regarding when and where these publications should be utilized.The formulation and pu

7、blication of API publications is not intended in any way to inhibit anyone from using any other practices.Any manufacturer marking equipment or materials in conformance with the marking requirements of an API standard is solely responsible for complying with all the applicable requirements of that s

8、tandard.API does not represent,warrant,or guarantee that such products do in fact conform to the applicable API standard.Classified areas may vary depending on the location,conditions,equipment,and substances involved in any given situation.Users of this RP should consult with the appropriate author

9、ities having jurisdiction.All rights reserved.No part of this work may be reproduced,translated,stored in a retrieval system,or transmitted by any means,electronic,mechanical,photocopying,recording,or otherwise,without prior written permission from the publisher.Contact the Publisher,API Publishing

10、Services,1220 L Street,NW,Washington,DC 20005.Copyright 2011 American Petroleum Institute ForewordThis Standard is intended to provide guidance to terminal personnel for the inspection and repair of existing metallic piping systems at terminal facilities.This Standard is based largely on accepted in

11、dustry practice for the inspection and repair of terminal piping.It is the intent of the American Petroleum Institute(API)to keep this publication up-to-date.All terminal piping system Owner/Users are invited to report their experiences in the inspection and repair of piping systems whenever such ex

12、periences may suggest a need for revising or expanding the practices set forth in API 2611.This edition of API 2611 is the first edition.Each edition,revision,or addenda to this API Standard may be used beginning with the date of issuance shown on the cover page for that edition,revision,or addenda.

13、Nothing contained in any API publication is to be construed as granting any right,by implication or otherwise,for the manufacture,sale,or use of any method,apparatus,or product covered by letters patent.Neither should anything contained in the publication be construed as insuring anyone against liab

14、ility for infringement of letters patent.Shall:As used in a standard,“shall”denotes a minimum requirement in order to conform to the specification.Should:As used in a standard,“should”denotes a recommendation or that which is advised but not required in order to conform to the specification.This doc

15、ument was produced under API standardization procedures that ensure appropriate notification and participation in the developmental process and is designated as an API standard.Questions concerning the interpretation of the content of this publication or comments and questions concerning the procedu

16、res under which this publication was developed should be directed in writing to the Director of Standards,American Petroleum Institute,1220 L Street,NW,Washington,DC 20005.Requests for permission to reproduce or translate all or any part of the material published herein should also be addressed to the director.Generally,API standards are reviewed and revised,reaffirmed,or withdrawn at least every five years.A one-time extension of up to two years may be added to this review cycle.Status of the p

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 专业资料 > 国外标准

copyright@ 2008-2023 wnwk.com网站版权所有

经营许可证编号:浙ICP备2024059924号-2