1、 IEC TR 62757 Edition 1.0 2015-07 TECHNICA L REPOR T Fire prev ention measures on conv erters for high-v oltage direct current(HV DC)sy stems,static v ar compensators(SV C)and flexible ac transmission systems(FACTS)and their v alv e halls IEC TR 62757:2015-07(en)Copyright International Electrotechni
2、cal Commission THIS PUBLICA TION IS COPYRIGHT PROTECTED Copyright 2015 IEC,Geneva,Switzerland All rights reserved.Unless otherwise specified,no par t of this publication may be reproduced or utilized in any for m or by any means,electronic or mechanical,including photocopying and microfilm,without p
3、er mission in writing fr om either IEC or IECs member National Committee in the country of the requester.If you have any questions about IEC copyright or have an enquiry about obtaining additional r ights to this publication,please contact the address below or your local IEC member National Committe
4、e for further infor mation.IEC Centr al Office Tel.:+41 22 919 02 11 3,rue de Varemb Fax:+41 22 919 03 00 CH-1211 Geneva 20 infoiec.ch Switzerland www.iec.ch About t he IEC The International Electr otechnical Commission(IEC)is the leading global organization that prepar es and publishes Inter nation
5、al Standards for all electr ical,electronic and related technologies.A bout IEC publications The technical content of IEC publications is kept under constant review by the IEC.Please make sur e that you have the latest edition,a cor rigenda or an amendment might have been published.IEC Cat alogue-we
6、bstore.iec.ch/cat alogue The stand-alone application for consulting the entire bibliographical information on IEC International Standards,Technical Specifications,Technical R eports and other documents.A v ailable for PC,Mac OS,A ndroid Tablets and iPad.IEC publications search-w w w.iec.ch/searchpub
7、 The adv anced search enables to find IEC publications by a variety of criteria(reference number,text,technical committee,).It also gives information on projec ts,replaced and withdrawn publications.IEC Just Published-webstore.iec.ch/justpublished Stay up to date on all new IEC publications.Just Pub
8、lished details all new publications released.A v ailable online and also once a month by email.Elect ropedia-w w w.elect ropedia.org The worlds leading online dic tionary of elec tronic and electrical terms containing more than 30 000 terms and definitions in English and French,with equiv alent term
9、s in 15 additional languages.Also known as the International Elec trotechnical Vocabulary (IEV)online.IEC Glossar y-st d.iec.ch/glossary More than 60 000 electrotechnical terminology entries in English and French extracted from the Terms and Definitions clause of IEC publications issued since 2002.S
10、ome entries hav e been collected from earlier publications of IEC TC 37,77,86 and CISPR.IEC Customer Service Cent re-webstore.iec.ch/csc If y ou wish to giv e us y our feedback on this publication or need further assistance,please contact the Customer Serv ice Centre:csciec.ch.Copyright Internationa
11、l Electrotechnical Commission IEC TR 62757 Edit ion 1.0 2015-07 TECHNICA L R EPOR T Fire prev ention measures on conv erters for high-v oltage direct current(HV DC)systems,static v ar compensators(SV C)and flexible ac transmission systems(FACTS)and their v alv e halls INTERNATIONAL ELECTROTECHNICAL
12、COMMISSION ICS 13.220.20 ISBN 978-2-8322-2788-6 R egist er ed tr ademar k of t he Int er national Electr ot echnical Commission Warning!Make sure that you obtained this publication from an authorized distributor.Copyright International Electrotechnical Commission 2 IEC TR 62757:2015 IEC 2015 CONTENT
13、S FOREWORD.5 1 Scope.7 2 Normative references.7 3 Terms and definitions.7 4 Fire hazards in valves and valve halls.13 4.1 General.13 4.2 Possible causes.13 4.2.1 Valve insulation failure.13 4.2.2 Loose connections or high resistance joints in the power circuit.13 4.2.3 Valve component failures.14 4.
14、2.4 Semiconductor device level connections.15 4.2.5 Coolant system problems.16 4.2.6 Failure of valve hall bushings.17 4.2.7 Failure of surge arresters.17 4.2.8 False operation of deluge system.17 4.2.9 Other valve hall equipment.17 4.2.10 Work in and around valve hall.17 4.3 Assessment of possible
15、consequences.18 5 Valve hall layout and access.18 5.1 Physical arrangements.18 5.1.1 General.18 5.1.2 Present practices.19 5.1.3 Specific provisions.19 5.2 HVDC valve hall construction.19 5.2.1 General.19 5.2.2 Valve hall construction.20 5.3 Means of egress.20 6 Supervision of valve components and o
16、ther valve hall equipment.20 6.1 General.20 6.2 Supervision of valve components.21 6.2.1 General.21 6.2.2 On-line monitoring.21 6.2.3 Off-line checks and inspection.22 6.3 Supervision of other valve hall equipment.22 7 Fire detection systems.23 7.1 General.23 7.2 Detection and operating principles.23 7.2.1 General.23 7.2.2 Air sampling systems.23 7.2.3 Infra-red beam smoke detectors.23 7.2.4 Arc detector systems.24 7.2.5 Infra-red flame detectors.24 7.2.6 Ultraviolet(UV)flame detectors.24 7.2.7