收藏 分享(赏)

_RP_95J-2006_2020.pdf

上传人:益****师 文档编号:166727 上传时间:2023-03-03 格式:PDF 页数:24 大小:326.85KB
下载 相关 举报
_RP_95J-2006_2020.pdf_第1页
第1页 / 共24页
_RP_95J-2006_2020.pdf_第2页
第2页 / 共24页
_RP_95J-2006_2020.pdf_第3页
第3页 / 共24页
_RP_95J-2006_2020.pdf_第4页
第4页 / 共24页
_RP_95J-2006_2020.pdf_第5页
第5页 / 共24页
_RP_95J-2006_2020.pdf_第6页
第6页 / 共24页
亲,该文档总共24页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、Gulf of Mexico Jackup Operations for Hurricane SeasonAPI RECOMMENDED PRACTICE 95J FIRST EDITION,JUNE 2006REAFFIRMED,SEPTEMBER 2020Gulf of Mexico Jackup Operations for Hurricane SeasonUpstream SegmentAPI RECOMMENDED PRACTICE 95J FIRST EDITION,JUNE 2006REAFFIRMED,SEPTEMBER 2020Special NotesAPI publica

2、tions necessarily address problems of a general nature.With respect to particular circumstances,local,state,and federal laws and regulations should be reviewed.Neither API nor any of APIs employees,subcontractors,consultants,committees,or other assignees make anywarranty or representation,either exp

3、ress or implied,with respect to the accuracy,completeness,or usefulness ofthe information contained herein,or assume any liability or responsibility for any use,or the results of such use,of anyinformation or process disclosed in this publication.Neither API nor any of APIs employees,subcontractors,

4、consultants,or other assignees represent that use of this publication would not infringe upon privately owned rights.API publications may be used by anyone desiring to do so.Every effort has been made by the Institute to assure theaccuracy and reliability of the data contained in them;however,the In

5、stitute makes no representation,warranty,orguarantee in connection with this publication and hereby expressly disclaims any liability or responsibility for loss ordamage resulting from its use or for the violation of any authorities having jurisdiction with which this publication mayconflict.API pub

6、lications are published to facilitate the broad availability of proven,sound engineering and operatingpractices.These publications are not intended to obviate the need for applying sound engineering judgmentregarding when and where these publications should be utilized.The formulation and publicatio

7、n of API publicationsis not intended in any way to inhibit anyone from using any other practices.Any manufacturer marking equipment or materials in conformance with the marking requirements of an API standardis solely responsible for complying with all the applicable requirements of that standard.AP

8、I does not represent,warrant,or guarantee that such products do in fact conform to the applicable API standard.All rights reserved.No part of this work may be reproduced,stored in a retrieval system,or transmitted by any means,electronic,mechanical,photocopying,recording,or otherwise,without prior w

9、ritten permission from the publisher.Contact the Publisher,API Publishing Services,200 Massachusetts Avenue,NW,Suite 1100,Washington,DC 20001.Copyright 2008 American Petroleum InstituteForewordThis recommended practice(RP)is under the jurisdiction of the API Upstream Executive Committee on Drilling

10、and Production Operations(ECDPO)and was developed with guidance from and in cooperation with the International Association of Drilling Contractors(IADC)Jackup Rig Committee and the Offshore Operators Committees(OOC)Drilling Technical Subcommittee.Additionally,the Minerals Management Service(MMS)and

11、the U.S.Coast Guard(USCG)provided general guidance and assistance in the development of the RP.Nothing contained in any API publication is to be construed as granting any right,by implication or otherwise,for the manufacture,sale,or use of any method,apparatus,or product covered by letters patent.Ne

12、ither should anything contained in the publication be construed as insuring anyone against liability for infringement of letters patent.This document was produced under API standardization procedures that ensure appropriate notification and participation in the developmental process and is designate

13、d as an API standard.Questions concerning the interpretation of the content of this publication or comments and questions concerning the procedures under which this publication was developed should be directed in writing to the Director of Standards,American Petroleum Institute,200 Massachusetts Ave

14、nue,NW,Suite 1100,Washington,DC 20001.Requests for permission to reproduce or translate all or any part of the material published herein should also be addressed to the director.Generally,API standards are reviewed and revised,reaffirmed,or withdrawn at least every five years.A one-time extension of

15、 up to two years may be added to this review cycle.Status of the publication can be ascertained from the API Standards Department,telephone(202)682-8000.A catalog of API publications and materials is published annually and updated quarterly by API,200 Massachusetts Avenue,NW,Suite 1100,Washington,DC

16、 20001.Suggested revisions are invited and should be submitted to the Standards Department,API,200 Massachusetts Avenue,NW,Suite 1100,Washington,DC 20001,standardsapi.org.iiiContentsPage1Scope.12Overview.13Terms and Definitions.14Site .35Preloading Process.46Air Gap.47Unit Preparations and Evacuation.48Post-storm Recovery .59Post-storm Inspections.5Annex A.7Annex B.9Annex C.11Annex D.13FiguresA.1Recommended Air Gap for Jackups in Hurricane Season.8B.1Jackup Hurricane Data Collection Form.10D.1Ex

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 专业资料 > 国外标准

copyright@ 2008-2023 wnwk.com网站版权所有

经营许可证编号:浙ICP备2024059924号-2