1、81/220/NPNEW WORK ITEM PROPOSALProposerTC 81 SecretariatDate of proposal2003-06-04TC/SCTC 81SecretariatItalyClassification according to IEC Directives Supplement,Table 1D2 Date of circulation2003-06-06Closing date for voting2003-09-12A proposal for a new work item within the scope of an existing tec
2、hnical committee or subcommittee shall be submitted tothe Central Office.The proposal will be distributed to the P-members of the technical committee or subcommittee for voting,and to the O-members for information.The proposer may be a National Committee of the IEC,the secretariat itself,anothertech
3、nical committee or subcommittee,an organization in liaison,the Standardization Management Board or one of theadvisory committees,or the General Secretary.Guidelines for proposing and justifying a new work item are given inISO/IEC Directives,Part 1,Annex C(see extract overleaf).This form is not to be
4、 used for amendments or revisions toexisting publications.The proposal(to be completed by the proposer)Title of proposalIEC 62305-5:Protection against lightning Part 5:ServicesStandardTechnical SpecificationPublicly Available SpecificationScope(as defined in ISO/IEC Directives,Part 2,6.2.1)Proposal
5、following up and complying with the approved TC 81 New PublicationsPlan(see81/171/RQ)Purpose and justification,including the market relevance and relationship to Safety(Guide 104),EMC(Guide 107),Environmental aspects(Guide 109)and Quality assurance(Guide 102).(attach a separate page as annex,if nece
6、ssary)See Doc.81/170/QTarget datefor first CD 2003-12for IS 2005-12Estimated number of meetings 4Frequency of meetings:2 per yearDate and place of first meeting:2003-10 StockholmProposed working methods E-mail ftpRelevant documents to be consideredIEC 62305-1 CDV;IEC 62305-2 CD;IEC 62305-3 CD;IEC 62
7、305-4 CD;IEC 61663-1;IEC 61663-2.Relationship of project to activities of other international bodiesNoneLiaison organizationsNoneNeed for coordination within ISO or IECNonePreparatory workEnsure that all copyright issues are identified.Check one of the two following boxesA draft is attached for vote
8、 and commentAn outline is attachedWe nominate a project leader as follows in accordance with ISO/IEC Directives,Part 1,2.3.4(name,address,fax and e-mail):Mr.Ahmed Zeddam,France Telecom R&DDirecion Reseaux de Transport et d AccesLaboratoire Environment Compatibility and DependabilityTel:+33(0)2960539
9、38Fax:+33(0)296053427E-mail:Concerns known patented items(see ISO/IEC Directives,Part 2)Name and/or signature of the proposeryes If yes,provide full information as an annexnoG.B.Lo PiparoCopyright 2003 International Electrotechnical Commission,IEC.All rights reserved.It ispermitted to download this
10、electronic file,to make a copy and to print out the content for the solepurpose of preparing National Committee positions.You may not copy or mirror the file orprinted version of the document,or any part of it,for any other purpose without permission inwriting from IEC.2 81/220/NPComments and recomm
11、endations from the TC/SC officers1)Work allocation Project team New working group Existing working group no:WG 102)Draft suitable for direct submission as CD CDV Publication as a PAS3)General quality of the draft(conformity to ISO/IEC Directives,Part 2)Little redrafting needed Substantial redrafting
12、 needed no draft(outline only)4)Relationship with other activities In IEC In other organizations Remarks from the TC/SC officersAs this is part of the New Publications Plan,which has been approved See documents 81/170/Qand 81/171/RQ P-members should confirm existing experts in WG 10 or nominate new
13、ones.Elements to be clarified when proposing a new work itemTitleIndicate the subject matter of the proposed new standard.Indicate whether it is intended to prepare a standard,a technical report or an amendment to an existingstandard.ScopeGive a clear indication of the coverage of the proposed new w
14、ork item and,if necessary for clarity,exclusions.Indicate whether the subject proposed relates to one or more of the fields of safety,EMC,the environment orquality assurance.Purpose and justificationGive details based on a critical study of the following elements wherever practicable.a)The specific
15、aims and reason for the standardization activity,with particular emphasis on the aspects ofstandardization to be covered,the problems it is expected to solve or the difficulties it is intended toovercome.b)The main interests that might benefit from or be affected by the activity,such as industry,con
16、sumers,trade,governments,distributors.c)Feasibility of the activity:Are there factors that could hinder the successful establishment or generalapplication of the standard?d)Timeliness of the standard to be produced:Is the technology reasonably stabilized?If not,how much time islikely to be available before advances in technology may render the proposed standard outdated?Is theproposed standard required as a basis for the future development of the technology in question?e)Urgency of the activity,