收藏 分享(赏)

ASTM_D_6089_-_15.pdf

上传人:益****师 文档编号:175054 上传时间:2023-03-04 格式:PDF 页数:3 大小:62.63KB
下载 相关 举报
ASTM_D_6089_-_15.pdf_第1页
第1页 / 共3页
ASTM_D_6089_-_15.pdf_第2页
第2页 / 共3页
ASTM_D_6089_-_15.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Designation:D608915Standard Guide forDocumenting a Groundwater Sampling Event1This standard is issued under the fixed designation D6089;the number immediately following the designation indicates the year oforiginal adoption or,in the case of revision,the year of last revision.A number in parentheses

2、 indicates the year of last reapproval.Asuperscript epsilon()indicates an editorial change since the last revision or reapproval.1.Scope*1.1 This guide covers what and how information should berecorded in the field when sampling a groundwater monitoringwell.Following these recommendations will provi

3、de adequatedocumentation in most monitoring programs.In somesituations,it may be necessary to record additional or differentinformation,or both,to thoroughly document the samplingevent.In other cases,it may not be necessary to record all ofthe information recommended in this guide.The level ofdocume

4、ntation will be based on site-specific conditions andregulatory requirements.1.2 This guide is limited to written documentation of agroundwater sampling event.Other methods of documentation(that is,electronic and audiovisual)can be used but are notaddressed in this guide.The specific activities addr

5、essed in thisguideincludedocumentationofstaticwaterlevelmeasurement,monitoring well purging,monitoring wellsampling,fieldmeasurements,groundwatersamplepreparation,and groundwater sample shipment.1.3 This standard does not purport to address all of thesafety concerns,if any,associated with its use.It

6、 is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.1.4 This guide offers an organized collection of informationor a series of options and does not recommend a specificcourse

7、of action.This document cannot replace education orexperience and should be used in conjunction with professionaljudgment.Not all aspects of this guide may be applicable in allcircumstances.This ASTM standard is not intended to repre-sent or replace the standard of care by which the adequacy ofa giv

8、en professional service must be judged,nor should thisdocument be applied without consideration of a projects manyunique aspects.The word“Standard”in the title of thisdocument means only that the document has been approvedthrough the ASTM consensus process.2.Referenced Documents2.1 ASTM Standards:2D

9、5088 Practice for Decontamination of Field EquipmentUsed at Waste SitesD5608 Practices for Decontamination of Field EquipmentUsed at Low Level Radioactive Waste SitesD5903 Guide for Planning and Preparing for a GroundwaterSampling Event3.Terminology3.1 DefinitionsFor definitions of terms used in thi

10、s guide,refer to Terminology D653.3.2 Definitions of Terms Specific to This Standard:3.2.1 chain of custodythe process of maintaining account-ability of the samples for the purpose of identifying potentialbreaches in sample integrity.3.2.2 chain of custody recorda record of all individualswho posses

11、s the samples from the time of collection untilanalysis.4.Significance and Use4.1 When sampling groundwater monitoring wells,it is veryimportant to thoroughly document all field activities.Sufficientfield data should be retained to allow one to reconstruct theprocedures and conditions that may have

12、affected the integrityof a sample.The field data generated are vital to the interpre-tation of the chemical data obtained from laboratory analysesof samples.Field data and observations may also be useful toanalytical laboratory personnel.4.2 Due to the changing nature of regulations and otherinforma

13、tion,users are advised to thoroughly research require-ments related to packaging and shipping prior to initiating asampling event.NOTE1The sampling of an individual groundwater monitoring wellshould be repeated as closely as possible each time the monitoring well issampled.This reduces the variabili

14、ty of the chemical parameters due tosampling variability which is the desired result.The intent is to detect thechange in chemistry by repeating the sampling protocol at each individual1This guide is under the jurisdiction ofASTM Committee D18 on Soil and Rockand is the direct responsibility of Subc

15、ommittee D18.21 on Groundwater andVadose Zone Investigations.Current edition approved March 1,2015.Published March 2015.Originallyapproved in 1997.Last previous edition approved in 2010 as D6089 97(2010).DOI:10.1520/D6089-15.2For referenced ASTM standards,visit the ASTM website,www.astm.org,orcontac

16、t ASTM Customer Service at serviceastm.org.For Annual Book of ASTMStandards volume information,refer to the standards Document Summary page onthe ASTM website.*A Summary of Changes section appears at the end of this standardCopyright ASTM International,100 Barr Harbor Drive,PO Box C700,West Conshohocken,PA 19428-2959.United States1 well.This does not mean that all the wells are sampled the same way,nordoes it prohibit changes in the sampling protocol,provided they areplanned and documented.5.Doc

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 专业资料 > 国外标准

copyright@ 2008-2023 wnwk.com网站版权所有

经营许可证编号:浙ICP备2024059924号-2